Release 5.5.0.0 - January 2021
The 5.5.0.0 release included the following:
Feature | Description | Hyper-link |
---|---|---|
Consistent Resource Filtering |
The filter options to display the most appropriate Resources to the User have been updated in version 5.5.0.0 and the same filter options are now available in all areas of MRI Evolution where users assign Resources to Tasks:
|
|
New Toolbar Button in Tasks input Panels and Grids to restore Tasks from History |
Previously, the method used to restore a Task that's been sent to History is to select the status change button entitled 'Mark as Complete'. This method is to be replaced by a new Toolbar button entitled 'Restore Task'. The old Mark as Complete button will still be available but should be hidden for Tasks that have a status of REJECTED, HISTORY or CANCELLED. The new Restore Task button will be available in the Status button group in the toolbar of the following pages:
|
|
Advanced Helpdesk |
Assign Group and Buttons added to Toolbar of the Advanced Helpdesk Surveys Sub Nav added to Advanced Helpdesk Rename Mobile Audits Group and Nav Item in Advanced Helpdesk Open Planner button added to Assign Toolbar group in Advanced Helpdesk – opens resource planner Advanced Helpdesk Resource Sub Nav updated Right Hand Pane in Advanced Helpdesk into two Tabs - Dates and SLA and Appointments |
|
Time Records | Redesign Time Records Input Panel | Time Records |
Tasks grid |
Add Contractor Status Buttons to Tasks Grid Open Planner button added to Assign Toolbar group in Tasks Grid – opens resource planner |
Tasks grid |
Task Settings User Preferences - Tasks |
New State Change Reasons entity, grid and input panel New Scheduling SLA Preferences REJECTED and ACCEPTED states added to System Task and User Preferences for Event Creation |
|
Appointments |
Appointment Types: Grid and Input Panel Appointment Visits Grid & Input Panel Appointment Visit Resolutions - Grid & Input Panel Calendar Days Input panel updated to include a new checkbox field for Use for Appointments Calendar Sessions Input panel updated to include a new fields related to Appointments Contract Input Panel to Include Enable Appointments checkbox Requests input panel |
|
Resource Planner |
Requirements and Events in-line icons and div panels added to the Task Grid in Resource Planner New Resource Planner Preference to enable or disable Appointment Highlights in the Resource Planner Implement Task Resource Filter Control Update Estimated Travel Time Option added to Context Menu for Time Record Objects Route Summary Information added to Map View Pane Resource Planner to support new Colouration Mode for Scheduling SLA Indicator Time Record Information Window in Resource Planner modified to Include Appointment Fields Resource Planner loaded directly from Tasks in 'Filter by Tasks' mode Map Control added to Day Pane in Overview mode New Appointment Types and Statuses in Task Colouration Rules for Resource Planner Open Appointment option added to Context Menu for Time Record Objects |
|
Surveys |
The existing Survey Templates Grid and Input Panel to be used for the new derived Work Survey Templates entity New Supply Chain Survey Templates Grid and Input Panel |
|
Document Repositories | Survey Response Store added to Document Repositories input panel | Document Repositories |
Contact Tasks |
Assign Group and buttons added to Toolbar of the Contact Tasks page Accept and Reject buttons added to Status Toolbar in Contact Tasks |
Contact Tasks |
Projects | Replace Project Flash GANTT chart with Telerik RadGant Version | Projects - Gantt Chart |
Contracts | New Contract Settings that will control whether the system automatically changes the status of Confirmed Appointments to Despatched and when this should happen | Contracts |
Contacts | Multi select drop down box for Contact Preference added to the Communication Preferences tab | Contacts |