PPM Planner
The PPM Planner in MRI Evolution provides a graphical means for viewing, planning and rescheduling dormant PPM Tasks to ensure most efficient use of Resources and to aid in viewing for any upcoming scheduling challenges.
When the PPM Planner is initially launched, it will open in a new window with a blank grid.
To create PPMs see Planned Preventative Maintenance - PPMs
Task Management > PPM Planner
The PPM Planner only shows Dormant PPMs, once a PPM has been issued it will disappear from the Planner and be viewable in Tasks.
The PPM Planner can be filtered to make the view of the Planner easier to manage and view. A minimum filter of Contract Group or Contract must be applied.
Available from 4.5.6.0
The PPM Planner Filter bar is on the right hand side of the planner, this panel can be displayed or hidden by clicking on the dark grey bar halfway up.
Available from 6.0.1.0
Users will not be able to select a Contract with a Contract Type of Triage Only in the Contract filter.
Available from 6.3.0.0
Support has been added to the PPM Planner for PPMs with a Daily frequency:
-
Daily PPMs are displayed with a
icon
-
New Days frequency added to the Legend
-
Days of the week added to the hover tooltip
-
Hours Required and % Committed footer calculations have been updated:
-
The Hours Required for Daily PPMs is based on the Estimated Time of the PPM multiplied by the number of Tasks that would be generated within that week
-
Calculations for % Committed use the adjusted Estimated Time for Daily PPMs
-
- The numbers along the top of the window indicate the week numbers with the date of the first Monday in the Month.
- Hovering the mouse cursor over a specific week number will display the date of the Monday of that week.
- Pink and Yellow coloured Row Headers indicate Assets in the same Task Family. A change in colour indicates either a change in the Asset or the Family of the PPM.
- Tasks frequencies will alter the colour of PPMs displayed in the Planner. The number displayed in each instance of a Weekly, Monthly or Yearly PPM indicates the frequency:
- Red = Weekly
- Blue = Monthly
- Green = Yearly
- Purple = Seasonal
- Black = Suspended
- Hours Required will show the number of hours required to complete the PPMs. Supplier Hours shows the number of hours available per week (calculated from Rotas). The last row shows what the percentage of available hours that would need to be committed to Tasks for that week.
- A single PPM my be rescheduled by clicking and dragging the PPM horizontally on the same Line.
- A single PPM may be dropped by right clicking on the PPM and selecting Drop Dormant Record. Available from 4.5.6.0
- A single PPM can be deleted by right clicking on the PPM and selecting Delete Dormant Record. Available from 4.5.6.0
- A single PPM may be added by right clicking on a white space on the line and selecting Add.
Click to view - PPM Planner Icons and Descriptions
Complete the required changes and close the window.