PPM Planner
The PPM Planner in Concept Evolution provides a graphical means for viewing, planning and rescheduling dormant PPM Tasks to ensure most efficient use of Resources and to aid in viewing for any upcoming scheduling challenges.
When the PPM Planner is initially launched, it will open in a new window with a blank grid.
To create PPMs see Planned Preventative Maintenance - PPMs
Task Management > PPM Planner
The PPM Planner only shows Dormant PPMs, once a PPM has been issued it will disappear from the Planner and be viewable in Tasks.
The PPM Planner can be filtered to make the view of the Planner easier to manage and view. A minimum filter of Contract Group or Contract must be applied.
Available from 4.5.6.0
The PPM Planer Filter bar is on the right hand side of the planner, this panel can be opened and closed by clicking on the dark grey bar
- The numbers along the top of the window indicate the week numbers with the date of the first Monday in the Month.
- Hovering the mouse cursor over a specific week number will display the date of the Monday of that week.
- Pink and Yellow coloured Row Headers indicate Assets in the same Task Family. A change in colour indicates either a change in the Asset or the Family of the PPM.
- Tasks frequencies will alter the colour of PPMs displayed in the Planner. The number displayed in each instance of a Weekly, Monthly or Yearly PPM indicates the frequency:
- Red = Weekly
- Blue = Monthly
- Green = Yearly
- Purple = Seasonal
- Black = Suspended
- Hours Required will show the number of hours required to complete the PPMs. Supplier Hours shows the number of hours available per week (calculated from Rotas). The last row shows what the percentage of available man hours would need to be committed to Tasks for that week. .
- A single PPM my be rescheduled by clicking and dragging the PPM on the same Line.
- A single PPM may be dropped by right clicking on the PPM and selecting Drop Dormant Record. Available from 4.5.6.0
- A single PPM can be deleted by right clicking on the PPM and selecting Delete Dormant Record. Available from 4.5.6.0
- A single PPM may be added by right clicking on a white space on the line and selecting Add.
|
Previous Page |
Allows the User to scroll back to the Previous Page. |
|
Next Page |
Allows the User to scroll forward to the Next Page. |
|
Previous |
Allows the User to scroll to a previous week or month. |
|
Next |
Allows the User to scroll to a future week or month. |
|
Rollback |
A pop up window will appear which will allow the User to roll back or undo previous actions to the point of last save or build. |
|
Adjust PPM Lock |
When a line / s have been selected by checking the adjacent check box and this Icon is clicked it will allow the User to adjust the Lock status of a Task /s. For more information see Task Lock Status. Available from 4.3.0 |
|
Change PPM Status |
Available from 4.5.0
Select the line / lines to change a PPMs status. There are three generic states:
- Active - the PPM is active and running.
- Suspended - the PPM is temporarily not required and will show suspended in the PPM Planner.
- History - the PPM is no longer required and will not be viewable in the PPM Planner.
Note: In versions prior to 4.5.0 a PPM could be suspended and reinstated using Suspend PPM and Resume PPM .
|
|
Assign Resource to selected PPM |
Click to pre assign a PPM consistently to the same Resource, a pop up window will appear allowing the Resource to be selected. |
|
Show Family Task Override |
Click to view which PPMs will be issued, any Tasks that will be overridden by Family Task Override will be hidden in this view. |
|
Show tooltips |
Click to enable a pop window when hoovering over a PPM. |
|
Show PPM Charts |
Click to view Task quantities,
Resource usage and
Resource requirements
charts. |
|
Print PPM Plan |
Click to print the PPM Planner. |
|
Export PPM Plan |
Click to export the PPM Planner. |
|
Show / Hide Suspended PPMs |
Click to hide suspended PPMs from the Planner, click again to return to the standard view. |
|
Toggle colouring PPMs by Compliance Type |
Click to toggle the PPM planner to the Compliance Type colouration, click again to return to the standard view. For more information on set up see Compliance Types. Available from 4.3.0
|
|
Show Legend |
Click to see the legend for the colouration in the PPM Planner. |
|
User Preferences |
Available from 4.5.6.0
Click to set PPM Planner User Preferences
- Set which filter preferences are to be seen from Contract, Contract Group and System Query
- Set which Totals can be seen from Hours required, Primary Supplier Hours and % Committed
- Assign the required filters, set the order of the filters using Move First , Move Up , Move Down and Move Last
|
Complete the required changes and close the window.