Task WIP Grid
The Task WIP Grid shows all Tasks that have WIP cost Breakdown information.
It is a grid view which can be searched, sorted, and customised. See Using Grid Controls.
By default the grid will show WIP related data, though it can be toggled to show Task related data.
Modules > WIP > Task WIP Grid
The link will open the Task WIP Grid. It is a grid view which can be searched, sorted and customised as normal.
To toggle between Task Grid and Task WIP Grid click Toggle Grid .
Once in the WIP Task Grid, WIP Reports can be run .Running Totals can also be seen in the bottom right corner of the grid.
Highlight the required Task and click WIP Report . MRI Evolution will run the Task Advanced Finance Summary report (WIP -001)
Note: To print WIP reports the Task WIP grid must be toggled to Tasks
WIP Tasks (in Draft Status) can be regenerated from this grid. Highlight the required Tasks and click Regenerate Task Cost Type Breakdowns .
A pop up window will appear with the highlighted Tasks in the top pane and the available WIP Templates in the bottom pane. Highlight the required Tasks and the required WIP template click Regenerate Task Cost Type Breakdowns .
Note: A WIP Task Cost Summary by Contract report can be printed from Modules > Concept Reports > (Name) WIP-002 WIP (Description) Task Cost Summary by Contract