Contracts - Schedule Of Rates
If a Schedule Of Rates is being used to calculate Costs in MRI Evolution it must be attached to the Contract. Individual items can be created against the Contract or a Master Schedule Of Rates can be imported.
Facilities > Contracts - Schedule Of Rates
The link will open the Contract / Schedule Of Rates grid. It is a grid view that can be customised and sorted as normal.
To add a new Schedule Of Rates click New , to edit an existing Schedule Of Rates click Edit
. A pop up window will appear which will allow the creation or amendment of a Schedule Of Rate.
To import a Master Schedule Of Rates click Import Master Schedule Of Rates .
Available from 5.8.1.0
Since the addition of States to Master Schedule Of Rates, the import function has been updated as follows:
-
Suspended Master Schedule Of Rates should be imported and values refreshed
-
The state of the Schedule Of Rates linked to the suspended Master Schedule Of Rate will be updated to suspended
-
-
Historic Master Schedule Of Rates should NOT be imported
-
If any existing Schedule Of Rates are linked to the Historic Master Schedule Of Rates these will be updated to History
-
If any existing Schedule Of Rates are Suspended and linked to a Master Schedule Of Rates that is Active, these will be updated to Active
To create a Master Schedule Of Rates see Master Schedule Of Rates Groups
Click to view - Schedule Of Rates Items Fields and Descriptions
Complete the fields and click Save. Once the Schedule of Rate Item has been completed and saved it will be available to be added to a Task in the current Contract.
Schedule of Rate Item Toolbar Icons

Icon | Feature | Description |
---|---|---|
![]() |
Save Button Group | Save | Save and New | Save and Close |
|
Copy |
Available from 5.8.1.0 It is possible to create a copy of the current Master Rate Item record by clicking the Copy button in the toolbar. When clicked, the page enters Copy Mode. All values from the 'original' Master Rate Item record are retained when in Copy Mode and can be changed where necessary. |
![]() |
Status Change Button |
Available from 5.8.1.0 The button opens an expandable group containing buttons for all available state transitions:
Selecting a state from the group will change the Status of the current Schedule of Rate Item to the selected value. |
![]() |
Refresh from Master Rate |
Available from 5.8.1.0 Click the button to replace the SOR Item field values using the current values from the associated Master SOR Item. Note: The button is disabled if the current Schedule Of Rates Item is not linked to a Master SOR Item. |